Project Listing

  • Albany Medical Center
  • Albany Molecular Research Inc.
  • Ardent Mills
  • Colonie Center Mall
  • Crossgates Mall
  • Lake George Outlets
  • General Electric
  • Georgia Pacific
  • Glenmont Abbey Village
  • Glens Falls Hospital
  • Lucky Strike
  • Northern Dutchess Hospital
  • Plattsburgh International Airport
  • Sabic Innovative Plastics
  • Saint Gobain
  • Saratoga Casino Raceway Hotel
  • SUNY New Paltz
  • Vassar Hospital
  • Von Roll USA

Inspect to Protect

get a quote Don't delay safety, contact Absolute Fire Protection to inspect and protect!

AFPI

1182 US Rt. 9W
PO Box 10
Selkirk, NY 12158

mail@absolutefirepro.com
24-7 365 Days a Year
Office Phone: 518-767-3700
Office Fax: 518-767-3711
Emergency: 518-281-3332 Before 7:00 AM/After 4:30 PM

Quick FAQ....

I have a standpipe system with two risers. The original design indicates a total flow of 750 gpm (2839 Lpm). Am I required to flow this much water for the five year flow test?

No. When conducting the five year flow test, one riser is tested at a time. Therefore, the flow should be a total of 500 gpm (1892 Lpm), 250 gpm (946 lpm) for each of the two topmost outlets.